A29Delivery risk: RedGate: pending
Cut EU trade friction with a scoped food-and-farm deal
Existing action A29, assessed at the same scope.
Provisional single-reviewer assessment; not an approved business case.
- Who and where
- Agri-food exporters and importers in Great Britain, consumers, and Northern Ireland traders. (from the action record) Jurisdiction: UK.
- Result so far
- Range if completed: 11.0–17.0 out of 30 (equal weights; not yet assessed: expected incremental benefit (Bn), incremental affordability (Co))
- Funded now (baseline)
- Agreed in principle in May 2025; at September 2026 the FSA reported negotiations “at an advanced stage” after the July 2026 summit was postponed, with implementation planning assuming summer 2027 and legislation expected through an anticipated European Partnership Bill. Not yet an operating agreement. (from the action record)
- The change assessed (marginal)
- Conclude the SPS agreement. (from the superseded 4 October selection table)
- Domain home: Brexit
- In the national plan: Growth and prosperity list
- The evidence trail for this option →
What the evidence supports—and the next decision
Reduced food and farm border friction is narrower than reversing the economy-wide effects of Brexit.
AI-assisted analytical follow-up · 8 October 2026. Proposed appraisal design; the attributed scores below are unchanged. No funding or delivery agreement is implied.
- Define the change
- Appraise the actual SPS agreement and its implementation requirements against current border procedures, separately for affected products and businesses.
- Test whether it works
- Certification cost, rejected consignments, delays and trade in affected goods; distinguish new trade from diversion and changes in demand.
- Establish the cost
- Public implementation and inspection, business adjustment, ongoing compliance and distribution across firms. Use the agreed legal text before a final estimate.
- Protect against harm
- Retain food safety and biosecurity. Do not transfer an economy-wide Brexit estimate to this agreement.
Read with the outcome evidence and sources in the full assessment. Monitoring proposals are not existing baseline measurements. A numerical benefit or cost score needs evidence for the defined increment, not just the scale of the problem.
Full assessment of Cut EU trade friction with a scoped food-and-farm deal: ten criteria, scenarios, delivery, costs and monitoring
The ten criteria (0–3)
Each criterion is scored 0 to 3 by the reviewer. “Not yet assessed” means unknown: it is never counted as zero.
Scale and severity (Sc)2 of 3 — Serious harm to a defined group or widespread moderate harm
Reviewer’s reason: Provisional problem-importance judgement from linked site pages; not the scale of achievable benefit.
Increment beyond baseline (Ad)2 of 3 — Specific material change to existing delivery
Reviewer’s reason: Define covered goods, alignment, oversight and border changes; secure agreement and business transition. A missing rating requires a defined marginal change.
Confidence in the proposed action (Ev)1 of 3 — Indirect, mixed, modelled or weak causal support
Reviewer’s reason: Observed trade friction does not identify the effect of a future agreement; scope and baseline need updating.
Expected incremental benefit (Bn)Not yet assessed
Reviewer’s reason: Unknown unless a reasonably defined target-population benefit can be judged; no bonus merely for spanning domains.
Residual harms (Hm)1 of 3 — Material harm/unresolved mitigation
Reviewer’s reason: External agreement required; regulatory autonomy and uneven sector impacts.
Incremental affordability (Co)Not yet assessed
Reviewer’s reason: Public implementation, business compliance, adjustment and distributional costs under alternative agreements.
Delivery capacity (Ca)1 of 3 — Binding scarce resource
Reviewer’s reason: Define covered goods, alignment, oversight and border changes; secure agreement and business transition.
Distribution (Fa)2 of 3 — Mixed or broadly neutral with safeguards
Reviewer’s reason: Provisional distribution judgement for the stated target; verify who pays, who gains and excluded groups.
Meaningful first outcome (Ti)1 of 3 — More than three but less than ten years
Reviewer’s reason: First meaningful outcome, not announcement: Border time/cost, trade and consumer prices, with external shocks separated.
Readiness (Rd)1 of 3 — Legislation/external agreement or major enabling work
Reviewer’s reason: UK government and EU counterparts; relevant devolved authorities; Negotiation and scenario appraisal
Four weightings
Normalised as 10 × weighted sum ÷ sum of weights, on a 0–30 scale. Where a criterion is not yet assessed, the range is the lowest and highest result if it were later scored 0 or 3 — not a score, a confidence interval or a rank.
- Equal weights: Range if completed: 11.0–17.0 out of 30. Not yet assessed: expected incremental benefit (Bn), incremental affordability (Co). Funding gate: not passed.
- Evidence doubled: Range if completed: 10.9–16.4 out of 30. Not yet assessed: expected incremental benefit (Bn), incremental affordability (Co). Funding gate: not passed.
- Scale doubled: Range if completed: 11.8–17.3 out of 30. Not yet assessed: expected incremental benefit (Bn), incremental affordability (Co). Funding gate: not passed.
- Cost ignored (the funding gate still applies): Range if completed: 12.2–15.6 out of 30. Not yet assessed: expected incremental benefit (Bn), incremental affordability (Co). Funding gate: not passed.
Funding gate: Not passed — the cost is not yet assessed or no allocation is committed for this scope. Ignoring cost in a weighting never removes the gate.
Delivery risk and gate
Delivery risk shown: RedReview’s claim: Red. Best the recorded evidence allows: Red.
Review’s reason: External agreement required; regulatory autonomy and uneven sector impacts.
Why it is not Green yet
- Delivery obstacle: External agreement required; regulatory autonomy and uneven sector impacts..
- Scope (population, place and increment) not verified against the delivery baseline.
- No verified owner with the powers in place.
- Delivery capacity not verified.
- Lifetime incremental costs not complete.
- No credible funding (a committed allocation for the scope).
- Safeguards not specified.
- Monitoring lacks a metric, a data source or a baseline.
Green needs verified scope, a verified owner with the powers, verified capacity, complete lifetime costs with credible funding, specified safeguards and monitoring with a metric, source and baseline. Amber means appraisal gaps remain; Red means a material delivery obstacle. Red does not mean unimportant.
Gate: Pending — appraisal incomplete (review label: “Pending: incomplete appraisal”).
Why: Scores incomplete; Funding gate not passed (cost unknown or no credible funding).
The gate is separate from national list membership: being listed does not make an option eligible, and an eligible option need not be listed.
Cost and funding
Lifetime costing: Not established. Review: “Full incremental costing not established in reviewed material”.
- Public administration, business compliance and transition for an SPS agreement (not costed; C-A29-IMPLEMENTATION)
Still to cost: Public implementation, business compliance, adjustment and distributional costs under alternative agreements.
Funding status: not a spending proposal.
Owner, powers and capacity
Proposed owner: UK government and EU counterparts; relevant devolved authorities (proposed, unverified).
Powers: needs legislation or external agreement. Capacity: binding constraint.
Powers and capacity read from the review’s Rd and Ca anchors; no proposed owner has agreed to act (the review: “Proposed owners have not agreed to act”).
- England:
- UK government (Defra, Cabinet Office) and the European Commission; Parliament for implementing legislation; devolved administrations (action record)
- Scotland:
- UK government (Defra, Cabinet Office) and the European Commission; Parliament for implementing legislation; devolved administrations (action record)
- Wales:
- UK government (Defra, Cabinet Office) and the European Commission; Parliament for implementing legislation; devolved administrations (action record)
- Northern Ireland:
- UK government (Defra, Cabinet Office) and the European Commission; Parliament for implementing legislation; devolved administrations (action record)
Food and agriculture are partly devolved; the Scottish and Welsh governments and the Northern Ireland Executive have roles in implementation, not assessed here.
Dependencies, safeguards and risks
Depends on: None recorded.
Safeguards
None specified yet.
Risks and residual harms: External agreement required; regulatory autonomy and uneven sector impacts.
Monitoring and measured results
Metric: Border time/cost, trade and consumer prices, with external shocks separated.
Data source: Not yet named. Baseline: Not yet established.
Measures already on the domain page
- Goods exports to the EU, volume change since 2019: latest −14% (2025); baseline not published (United Kingdom).
A page measure is not necessarily the review’s metric; linking the two is an editorial decision still to be made.
Evidence for the outcome
Outcome: Border time/cost, trade and consumer prices, with external shocks separated.
Observed trade friction does not identify the effect of a future agreement; scope and baseline need updating.
Effect records for this action
- Cost and time of agri-food trade with the EU: size not established (plausible spillover, limited confidence; Great Britain and EU)
- UK freedom to set its own food and plant rules: size not established (plausible spillover, moderate confidence; United Kingdom)
SWOT points it addresses
- Goods exports to the EU were −14% in volume between 2019 and 2025, against −8% to the rest of the world; the EU series has a recording break in January 2021.
- There is a working treaty base to build on: the Trade and Cooperation Agreement, and a May 2025 Common Understanding committing both sides to negotiate an agri-food (SPS) agreement.
- A concluded SPS agreement would remove most export health certificates and routine checks on agri-food trade, and practical help could make the remaining processes usable for small firms.
- The agreement is not yet concluded: the July 2026 summit was postponed after the change of government, exceptions such as gene editing were still being negotiated, and alignment obligations would limit future divergence.
Review record
Assessment status: Provisional single-reviewer assessment; not an approved business case.
Reviewer: Original assessment author (name not supplied). Reviewed: 6 October 2026.
Scored in the working review of 6 October 2026 on the shared ten-criterion scale (one reviewer); not independently calibrated.
First 90 days (review): Produce a signed scope and current-delivery baseline; Define covered goods, alignment, oversight and border changes; secure agreement and business transition. Obtain incremental costs and an accountable decision before expansion.
Decision route: Negotiation and scenario appraisal
An earlier assessment exists on the 4 October 2026 selection table (nine H/M/L bands; superseded 7 October 2026). Its bands are kept, not converted into these scores.
An editorial screening framework by one reviewer, not a formal appraisal or business case. Proposed owners have not agreed to act.